Lumo: EUR 11.98m in collective proceedings with one borrower, GAUSSIN SA, plus EUR 6.6m late (16 Nov 2026)
Our check:
- Lumo's performance figures, generated on 16 November 2026, show 5 projects in collective proceedings with EUR 11,975,000 outstanding. Lumo says these are the 5 financing tranches of one borrower, GAUSSIN SA (the Innovation et Mobilite project), all lent in 2023.
- A further 7 projects are 0-6 months late with EUR 5,597,100 outstanding, and 1 project is more than 6 months late with EUR 1,019,950 outstanding.
- Why it matters: all EUR 11,975,000 depends on one company. Lumo's internal rate of return is 5.05% against 6.61% had every loan paid on time (annual cost of risk 1.56%); for 2023 loans it is 2.21%.
- What it is not: no loss is recorded yet; Lumo shows 0 projects as final losses. The outcome of the GAUSSIN proceedings is not known.
Checked by Crowdinform on 17 November 2026. The platform can reply here.